Referred Journal Papers:
[1] Jin, H., Nahangi, M., Goodrum, P., and Yuan, Y. (2020). Multiobjective Optimization for Scaffolding Space Planning in Industrial Piping Construction Using Model-Based Simulation Programming. ASCE Journal of Computing in Civil Engineering, 34(1), 06019001.
[2] Jin, H., Zhang, M., and Yuan, Y.(2018). Analytic Network Process-Based Multi-Criteria Decision Approach and Sensitivity Analysis for Temporary Facility Layout Planning in Construction Projects. Applied Sciences, 8(12), 2434.
[3] Jin, H., Nahangi, M., Goodrum, P., and Yuan, Y. (2017). Model-based Space Planning for Temporary Structures using Simulation-based Multi-objective Programming. Advanced Engineering Informatics, 33, 164-180.
[4] Bannier, P., Jin, H., and Goodrum, P. (2016). Work Envelope Requirements among Piping Trades and the Influence of Global Anthromorphic Characterstics. Journal of Information Technology in Construction. 21, 292-314